Municipal Health Office
Department Head: DR. RUDY P. ONG
Telephone Number:
Services offered:
Issuance of Sanitary Permit
Requirements:
Food and Non-Food:
- Duly Accomplished Application Form (Municipal Sanitary Office)
- Barangay Certification
- For renewal, previous year’s Sanitary Permit
Additional requirements based on category:
- a) Food Establishment:
– Sanitary Plan
– Waste Water Treatment Facility design and provision
– Food and drug permit
– Business Name
– National Meat Inspection Service Clearance
– Bacteriological, Physical-Chemical result of drinking Water Source with Certificate of Potability from local health office
– Photos of Sanitary Facilities
– Insect and Vermin Control Measure
– Food handler’s Training
– First Aid room
- b) Public places
Schools, Hotels, Supermarkets, Grocery stores, Malls, Abbatoirs, Tonsorial, Banks,
Financial Institutions, Hospitals, Clinics, Sports Den, Recreation Area, Resorts, Swimming Pools,
Cockpits and others.
– Sanitary Plan (signed and sealed by a registered Sanitary Engineer)
– Photo of Sanitary Facilities
– ECC-DENR
– Business Name (DTI)
– Bacteriological Exam/Physical-Chemical Exam of Water Source
– License to Operate (DENR)
– 1st Aid Kit (Corner)
- c) Drug Stores
– Licensed Pharmacist
– BFAD Permit
- d) Funeral Parlor
– Licensed Embalmer
– Sanitary Plan
- e) Agro-Industrial Establishments, Poultry and Piggery
– Sanitary Plan
– ECC-DENR
– Permit to Operate
– Discharge Permit/ Waste Water Treatment Facility
– Contract of Employment of Pollution Control Officer
- f) Industrial Establishments – Manufacturing/production
– Sanitary Plan
– ECC DENR
– License to operate
– Lot Title
– Business Name – DTI
– Pollution Control Officer Contract
– Water treatment facilities plan/picture
– Engineering Report and Plan of Water Supply Source
– HLURB Zoning Permit/SB
- g) Water Refilling Stations
– Sanitary Plan
– Engineering Report
– Physical-Chemical Analysis (every 6 months)
– Bacteriological Analysis (every month)
– Sanitary Engineer Contract (Consultant)
– 40 hrs, Training Course, (if none promissory note to attend)
- h) Waterworks
- – Endorsement from RHU
- – Inspector report of Sanitary Inspector
- – Water Site Clearance
- – Certificate of Potability
- – Physical/Chemical/Bacteriological analysis (Raw and Product)
- – Sanitary Plan (SE)
- – Development Plan/Site Development
- – Feasibility Study –IEE DENR
- – ECC / CNC (DENR)
- – SB Resolution (Development Plan)
- – Barangay Clearance
- – Title of Lot / Memorandum of Agreement / Contract of Lease/
- – Tax Declaration of Real Property
- – Vicinity Map / Location Plan
- – Sanitary Survey
- – Engineer’s Report
- – Water Permit (NWRB)
- i) Memorial Parks
- – Letter of Application
- – Development Permit of Owner
- – Lot Title (any other supporting documents in the acquisition of lands)
- – Tax declaration of Real Property
- – Municipal Resolution
- – Plans duly signed and sealed by respective profession;
- * Architectural Plans
- – Perspective
- – Elevations of Building/ sections/ details
- – Site development
- – Lot Plan Vicinity Map
- – Certificate from Local Health Officials that site fits purpose and
- Inspection report of assigned inspector in the locality.
- – Waiver of residents if site is within 20 meters zone and with water Supply source within 50 meters zone
- – Development plans should complete the following;
1) Drainage system
2) Fencing /Strong Gate
3) Chapel
4) Toilets for separate sex
5) Administrative Office
6) Pavements/Roadways/Path walks
Issuance of Health Certificate
Requirements:
Food Establishment:
- a) Videoke / Resto Bars
For GRO’s Others (Cooks, Crew, Helpers etc.):
– Cervical Smear – Urinalysis
– HIV – Fecalysis
– Hepatitis B – X-ray
– Drug test
– Urinalysis
– Fecalysis
– X-ray
– Sedula
– Birth Certificate
– Brgy. Clearance
– Working Permit
– Police Clearance
– 2×2 pictures – 2pcs
- b) Others
– Urinalysis
– Fecalysis
– X-ray
– Hepa-B
– Drug Test
For Non-Food Establishments:
- – Urinalysis
- – Fecalysis
- – X-ray